Utility
BC Hydro Glennanon (GLN)
Client: BC Hydro
Site Location: Glenannon Substation, Endako, BC
Scope of Work: Transformer Leak Repair
Pacific Powertech completed leak mitigation and full testing on three 500kV reactors at BC Hydro’s Glenannon Substation in Endako, BC. The project required a large on-site crew (10 personnel) and multiple cranes operating in tandem to meet a tight outage window. Work was delivered safely, on time, and without issues, and the team received strong feedback from BC Hydro.